Environmental Impact Assessment is a study of the possible impacts, both positive and negative on the Environment as well as the community due to the project. EIA studies have been made mandatory by the Ministry of Environment and Forests (MoEF), Govt of India through the Environmental impact Assessment Notification in 2006 and its subsequent amendments under the umbrella of Environment (Protection) Act, 1986.
Environmental Impact Assessment (EIA) is a process of evaluating the likely environmental impacts of a proposed project or development, taking into account inter-related socio-economic, cultural and human-health impacts, both beneficial and adverse.
S V Enviro undertakes marine environmental impact assessment of designated coastal developments with multidisciplinary approach and recommend suitable marine environment management plan to minimize adverse impacts on local ecology.
Risk analysis can be qualitative or quantitative. Qualitative risk analysis uses words or colors to identify and evaluate risks or presents a written description of the risk, and quantitative risk analysis (QRA) calculates numerical probabilities over
Land cover" is distinct from "land use", despite the two terms often being used interchangeably. Land use is a description of how people utilize the land and of socio-economic activity. Urban and agricultural land uses are two of the most commonly know
Environmental carrying capacity is interpreted as the maximum capacity that can carry the load of existing population. Carrying capacity of an area can be decreed due to natural forces or human activities (pollution, wasting of resources etc) and it ca
The site selection process includes a detailed evaluation of project needs which are then measured against the merits of potential locations. The process typically includes selecting and evaluating communities, real estate site analysis and acquisition
Noise levels arising from the proposed activity are modeled and the potential impact on species of interest within the affected area is then evaluated. Although there is considerable uncertainty in the relationship between noise levels and impacts on a
Transportation studies serve to quantify the extent of a transportation problem or to provide an analysis of a proposed transportation solution
Stakeholder involvement in the form of public consultation and it is a two-way communication between the project EIA team and the targeted and affected groups. Public participation has become mandatory component of EIAs for most projects
No Objection Certificate (NOC) for height clearance is a legal document issued by Airpo rts Authority of India on behalf of Central Government so that the airspace around aerodrome is maintained free from obstacles to permit the intended aeroplane oper
Our experts are qualified from RLI-Chennai and having on hand expertise in various industries including oil and gas
A Process Hazard Analysis (PHA) team includes process safety specialist, engineers, operators, supervisors and other workers w
A multidisciplinary site survey conducted prior to or in the initial stage of a joint operat ional deployment. The survey documents existing deployment area environmental conditions, determines the potential for present and past sitecontam ination (e.g